Projects
Link Alliance
Auckland, New Zealand | Project value $5.4bn
The City Rail Link (CRL) project contract 5 and 7 involves the construction of a new underground railway line spanning approximately 3.4km of tunnel railway systems and 2.8km of catenary construction through the heart of Auckland's CBD linking to the North Auckland Line. The project aims to enhance transport capacity, accessibility, and urban development while fostering economic growth and sustainability.
TED Rail has played a pivotal role in the success of CRL by providing multiple specialized services including:
Client contract interface
Construction programmes
Engineering assurance
On-site delivery
Budget control
OLE procurement lead
Wiri EMU Depot Expansion
Auckland, New Zealand | Project value $36m
The Wiri EMU Depot is a 550m purpose-built facility supporting Auckland’s growing electric fleet for the City Rail Link. It features 10 new stabling roads and acts as a key hub for ongoing fleet maintenance.
TED Rail was engaged to provide oversight of the OLE construction, ensuring design compliance, quality control, and safe delivery across a multidisciplinary build, including:
MSQA – OLE construction
Produce OLE Temporary Works Staging Design
On site inspections and monitoring
Design compliance review
ITP verification
Testing and Commissioning plan
Engineering Acceptance
Henderson Station
Auckland, New Zealand
The project formed part of the wider development of Henderson Station and its third platform, requiring the existing electrification infrastructure to be progressively modified and reconfigured while maintaining the safe operation of Auckland’s busy Western Line.
TED Rail services delivered:
Overhead Line Equipment (OLE) engineering and technical assurance
Site support, inspections and quality compliance
Design reviews and technical advisory services
Inspection & Test Plans (ITPs) and quality documentation
Testing, commissioning and Engineering Completion
City Rail Link
Auckland, New Zealand
As part of City Rail Link wider network upgrades including Otahuhu station 3rd main, Britomart station upgrade and Strand upgrade. OHW and traction lead for the construction contractor.
CRL contracts 1, 8 and 9 wider network upgrades includes Otahuhu station 3rd main, Britomart station and platforms, The Strand crossover upgrade.
TED Rail provided the following services:
Contract Responsible Engineer (CRE)
Temporary staging design
Construction management
Interdisciplinary programme
Change and cost control
Manchester MetroLink
Manchester, UK
Development of the greater Manchester light rail network including the Airport. On completion of Phase 3 the Metrolink became the largest light rail network in the UK.
OLE design
Onsite Engineer
Quality Assurance
Project handover